Specifier
notes are shown in italics and should be deleted from the final document. Generally all of the manufacturer’s products
in this category are listed and the specifier must take care to delete those
products not included in the project.
Depending
on the relative complexity of the project, the specifier may choose to combine
two or more Compartment and Cubicle Sections into one Section, Section 10150
Compartments and Cubicles, corresponding to the CSI MasterFormatä.
Edit
each Article in this Section to suit project requirements.
SECTION
10160
METAL TOILET COMPARTMENTS
1.01
SECTION
INCLUDES
A.
Overhead
braced, floor mounted painted steel compartments.
B.
Overhead
braced, floor mounted stainless steel compartments.
C.
Floor
mounted and braced painted steel compartments.
D.
Floor
mounted and braced stainless steel compartments.
E.
Ceiling
hung painted steel compartments.
F.
Ceiling
hung stainless steel compartments.
G.
Floor
mounted, ceiling braced painted steel compartments.
H.
Floor
mounted, ceiling braced stainless steel compartments.
I.
Painted
steel privacy and urinal screens.
J.
Stainless
steel privacy and urinal screens.
1.02
RELATED
SECTIONS
A.
Section
(select Sections that describe the
anchoring substrate: floor, walls and/or ceiling)
B.
Section
10810-Toilet Accessories
1.03
REFERENCES
A.
B.
ASTM
A653/A653M – Standard Specification for Steel Sheet, Zinc-Coated (Galvanized)
by the Hot-Dip Process.
C.
ASTM
A666 – Standard Specification for Austenitic Stainless Steel Sheet, Strip,
Plate, and Flat Bar.
D.
FS AA-60003
– Partitions, Toilet, Complete.
1.04
SUBMITTALS
A.
Provide
submittals in accordance with Conditions of the Contract and Section
01330-Submittal Procedures.
B.
Submit
shop drawings showing layout, profiles, and product components, including
anchorage, accessories and finish colors.
C.
Submit
product data on panel construction, hardware, and accessories.
D.
Submit
two samples 4 x 4 inch (102 x 102 mm) in size illustrating panel finish, color,
and sheen.
E.
Submit
maintenance data for installed products in accordance with Section
01780-Closeout Submittals.
1.05
DELIVERY,
STORAGE AND HANDLING
A.
Generally
comply with provisions of Section 01600-Product Requirements.
B.
Comply
with manufacturer’s ordering instructions and lead time requirements to avoid
construction delays.
C.
Deliver
materials in manufacturer’s original, unopened, undamaged containers with
identification labels intact.
D.
Store
materials indoors, in a supported vertical position, protected from weather
conditions and construction activities.
1.06
PROJECT
CONDITIONS
A.
Building
enclosed, completely protected from outside weather with minimum inside
temperature of 60°F.
1.07
WARRANTY
A.
Provide
manufacturer’s fifteen year warranty against panels rusting from the inside.
B.
Provide
manufacturer’s five year warranty for chrome hardware and lifetime warranty for
stainless steel hardware.
2.01
MANUFACTURERS
A.
The
Mills Company, a subsidiary of Bradley Corporation, P.O. Box 309, Menomonee
Falls, WI 53052-0309. Phone 800-Bradley
(800-272-3539), Fax 262-251-5817.
http://www.bradleycorp.com
B.
Substitutions:
[Section 01600 – Product Requirements]
[Not Permitted])
2.02
MANUFACTURED
UNITS
A.
Overhead
braced painted steel compartments, “Sentinel”–Series 400 (specify color and options).
B.
Overhead
braced stainless steel compartments, “Sentinel”-Series 400 (specify color and options).
C.
Floor
mounted and braced painted steel compartments, Series 500 (specify color and options).
D.
Floor
mounted and braced stainless steel compartments, Series 500 (specify finish and options).
E.
Ceiling
hung painted steel compartments, Series 600 (specify
color and options).
F.
Ceiling
hung stainless steel compartments, Series 600 (specify finish and options).
G.
Floor mounted
and ceiling braced painted steel compartments, Series 700 (specify color and options).
H.
Floor
mounted and ceiling braced stainless steel compartments, Series 700 (specify finish and options).
I.
Privacy
and urinal screens, painted steel panels (specify
color and options).
J.
Privacy
and urinal screens, stainless steel panels (specify
finish, and options).
2.03
COMPONENTS
A.
Steel
sheet: ASTM A653/A653M, with G90/Z275 zinc coating.
B.
Stainless
steel sheet: ASTM A666, 300 series.
C.
Panels,
doors, and pilasters: Sheet steel faces, pressure bonded to moisture-resistant
honeycomb core, formed as a two piece unit to interlock for a watertight fit,
with brazed corners ground smooth.
D.
Panels
and doors 1 inch (25 mm) thick, minimum 22 gauge face material.
E.
Pilasters
1-¼ inch (32 mm) thick, minimum 20 gauge face material.
F.
Internal
reinforcement: 16 and 14 gauge in doors at hinge locations; provide factory
installed concealed molybdenum cam. 18
gauge channel for anchoring pilaster.
G.
Door
top drilled to receive top hinge pin; latch holes pre-punched to allow field
installation of slide latch.
2.04
Accessories
A.
One-piece
pilaster shoes, 3 inch (76 mm) high type 304 stainless steel with #4 satin
brushed finish, anchored in place with concealed retainer clips.
B.
Head
Rails: 1-1/4 x 1-1/2 inch (25 x 38 mm) anodized aluminum tube with anti-grip
profile and cast socket wall brackets.
C.
Brackets:
[Chrome-plated non-ferrous cast metal] [stainless steel with brushed finish].
D.
Fasteners,
screws and bolts: Tamper proof [chrome-plated] [stainless steel].
E.
Hardware:
[Chrome-plated non-ferrous cast metal] [stainless steel].
1.
Wrap
around hinge brackets through-bolted to pilasters for gravity cams concealed in
door.
2.
Concealed
slide latch T290 with emergency egress release, meeting
3.
Wrap
around door strike/keeper.
4.
Coat
hook with rubber wall bumper; one per compartment, mounted on door.
5.
Door
pull and door stop for each out swinging door.
2.05
FACTORY
FINISHING
A.
Baked
enamel steel compartments: Clean, degrease, and neutralize. Follow immediately with electrostaticly
applied high solid density enamel.
B.
Stainless
steel compartments: [ANSI No. 4 finish, with the grain (belting) running the
long dimension of the component] [5WL textured][leather grain textured].
3.01
EXAMINATION
A.
Verify
that finishes and plumbing are complete and acceptable for the installation of
toilet compartments.
B.
Verify
field measurements are as shown on approved shop drawings.
C.
Verify
correct spacing of plumbing fixtures.
D.
Verify
correct location of built-in framing, blocking, anchorage, and bracing.
3.02
INSTALLATION
A.
Comply
with manufacturer’s written instructions and approved shop drawings for
installation of compartments.
B.
Anchor
panel brackets to construction using anchors suitable for supporting substrate.
C.
Attach
panels and pilasters to brackets. Locate head rail joints at pilaster
centerlines.
3.03
ADJUSTING
A.
Section
01700 – Execution Requirements: Testing, adjusting, and balancing.
B.
Adjust
and align hardware to uniform clearance at vertical edge of doors, not
exceeding 3/16 inch (5 mm).
C.
Adjust
hinges to position doors in [partially] [fully] opened position when
unlatched. Return out swinging doors to
closed position. (Note: Out swinging doors require wall or panel to limit door travel to
maximum of 105 degrees.)
D.
Touch-up
scratches and minor damage to installed products; remove and replace work that
cannot be satisfactorily repaired.
3.04
CLEANING
A.
Remove
packaging and construction debris, and legally dispose of off-site.
3.05
SCHEDULE
(Where multiple units are specified, it might
be best to give them a “mark” and
create a schedule).